Client

Beaver Mining Supplies

Location

Egypt, North Africa

Project

Grade 12 Titanium Seawater Intake Spools

Service

Specialised Welding & Fabrication Pressure Piping

Value

Up to $250k

Scope Of Work

Material procurement, fabrication, NDT, surface treatment, pack and prepare for shipment.

Project Resourcing

Fabrication:

  • Required coded welders and boilermakers experienced in Titanium welding.
  • Project Manager provided single point of contact with the client.

Installation:

  • Not included – shipping and site installation in Egypt by others.

Project Achievements

  • Client had confidence that we could execute the project due to our long-term experience working with titanium
  • Client required a short turnaround time to resolve any project issues
  • Tight delivery schedule to meet shipping dates.

Key Activities

Fabrication:

  • Material procurement
  • Workshop fabrication
  • Coded TIG welding to AS 3992
  • 100% material and weld traceability
  • Liaise with the client to ensure Manufacturers Data Report (MDR) contained the information required for future reference including as built information and drawing updates.