Client
Vermillion Oil and Gas
Location
Wandoo Offshore Oil Field
Project
316L Stainless Steel Pressure Vessel and Supporting Structure
Service
Pressure Vessels
Value
Up to $250k
Scope Of Work
Mechanical design and verification, General Arrangement and detail drafting, procurement, fabrication, NDT, hydrotesting, sandblast & paint and pack for shipment.
Project Resourcing
Fabrication:
- Required coded welders and boilermakers experienced in stainless steel structural fabrication.
- Project Manager provided single point of contact with the client.
Installation:
- Not included – shipping and site installation in offshore by others.
Project Achievements
- APMS provided a comprehensive project management service.
- Project delivered on time and on budget with 100% weld compliance rate.
- Changes during the design and fabrication process managed to the satisfaction of the client with no disruption to the project or delivery schedule.
Key Activities
Fabrication:
- Detailed mechanical design to AS1210 and verification
- 3D modelling and preparation of Autocad drawings
- Material procurement
- Workshop fabrication
- Coded TIG and FCAW welding to AS3992
- 100% material and weld traceability
- Coordination of multiple subcontractors including non-destructive testing (NDT), hydro testing, blasting & painting, logistic arrangements and documentation for shipping.
- Liaise with the client to ensure Manufacturers Data Report (MDR) contained the information required and drawing updates.